Survey by total station for rural water supply pipeline network complete in all respects. Preparation of DPR along with the design of proposed network pipeline, source work, rising main, water retaining structures. preparation unit cost estimates, design & detailed drawing in AUTO CADD software of all works as per direction of engineer in charge and preparation of complete DPR as per prevailing government guidelines including details of existing water supply network/structures. The consultant will submit soft copy of DPR along with hard copy and six sets of drawings in hard and soft copy. The assigned task shall include all activities to get technical and administrative/financial approval from the competent authority up to the level of government of uttarakhand.
|